This contract C1554 includes the roof refurbishment of the Brightwater Hall Roof in 2026 as part of a wider project to undertake building repairs, improve utilisation of space and bring the building up to an appropriate level of service.
| Current status | Delivery |
| Start Date | May 2026 |
| End date | June 2026 |
| Access | TBC |
| Contractors | Scotts Construction |
| Cost | $200k |
Contact: Email [email protected] for further information, reference 1554.
This project renews ageing water reticulation and rider mains in Brightwater on Lord Rutherford, Ellis St, River Terrace. This will integrate with Waimea Plains Project and provide high level of resilience to the Brightwater water supply.
| Current status | Planning |
| Start Date | Works 2028 |
| End date | June 2028 |
| Access | TBC |
| Contractors | TBC |
Contact: Email [email protected] for further information, reference 1516.
We’re upgrading the water and wastewater networks between Edward Street Wakefield and Katania Heights Brightwater. This work is part of a wider programme to improve essential infrastructure in the area.
As part of this project, we will install:
Both pipelines will follow the same route and be installed within a shared trench along Higgins Road.
| Current status | Planning/ Design |
| Start Date | Construction start 2026 |
| End date | June 2028 |
| Access | TBC |
| Contractors | TBC |
Contact: Email [email protected] for further information, reference 1663.
This project involves the design and construction of a new water pump station at the corner of Bird Road and Higgins Road, Brightwater.
| Current status | Delivery/Construction |
| Start Date | Construction start July 2026 |
| End date | June 2027 |
| Access | TBC |
| Contractors | Processflow Ltd |
Contact: Email [email protected] for further information, reference 1659.